1 Commits

Author SHA1 Message Date
Vijay Janapa Reddi
2dc556e1e5 docs(vault-cli): PHASE_6_HANDOFF.md — resume guide after Phase 5 mass-apply
Self-contained resume guide for the next session:

  - Confirms Phases 0-5 (autonomous) + 8 done
  - Documents 478 unresolved corrections (cross-refs PHASE_5_UNRESOLVED)
  - Step-by-step for Phase 5 cleanup → Phase 6 schema → Phase 7 verify
    → Phase 9 release
  - Concrete CLI commands for each step (vault audit review with
    --filter-gate flags, vault codegen, vault publish)
  - Reference doc map (which doc covers what)
  - Pipeline data layout (where the canonical 01_audit.json lives)
  - Full commit log from this session
  - Merge command to land yaml-audit on dev when ready
  - Paste-ready resume prompt for the next Claude Code session

Total estimated remaining work to ship vault 1.0.0: ~9h, mostly Phase 5
review + Phase 6 schema. Tree is clean; ready to hand off.
2026-05-04 07:14:47 -04:00